DTE Gas Main Location Project

October 27, 2018

In preparation for the 2019 Central Street road reconstruction project, DTE will be locating their gas mains in the following areas: Central between Monument Park and Third Street, Fifth between Broad and Central and Fourth between Central and Dover. Work is expected to start October 29, 2018 and will require DTE to dig small holes in certain areas to determine the exact location and depth of their gas mains. This work will occur in the road right of way.  In some cases, this may require temporarily closures of lanes with flag control. Please proceed with caution through construction zones.